The cost of construction will depend on many factors – the purpose, materials, type of contract, etc. Here’s a break-up of the approximate cost of construction at stages of a new house.


Consider 20x30 Duplex house construction of 1500SQft Built up area.



1. AREA MATRIX

 

GROUND FLOOR BUILT UP AREA

(Duplex- Parking, Staircase & Ground floor Living Space) 600 SQft.

 

FIRST FLOOR BUILT UP AREA

(Duplex - First floor Living Space) 600 SQft

 

TERRACE/ SECOND FLOOR BUILT UP AREA

(Terrace Headroom) 300SQft

 

TOT. BUILT UP AREA 1500SQft




2. SUMMARY OF COSTING


Description Or Scope of Work Amount/ Area Unit

 

TOTAL BUILD-UP AREA

(Total Built up area including Ground,

First & second floor roof slab, Staircase,

Portico & Parking area) 1500 SQft.

 

UNIT RATE PER SQFT

(Construction of Structure & Finishing ) 1800 SQft

 

TOTAL CONSTRUCTION COST

(Built up area of 1500 SQft ) 27,00,000 A

 

ADDITIONAL & EXTERNAL DEVELOPMENT WORKS

(Design Services, Compound Wall Construction, Back filling,

Under ground sump, Terrace Water proofing & Screed &

MS fabrication works) 3,75,0000 B

 

TOTAL CONSTRUCTION COST

(Excluding Interior & Fit outs)

(Including Structure, Finishes & The external development) 30,75,0000 A+B





3. INDICATIVE PROGRESS PAYMENT SCHEDULE


Construction Stages % of Payment Amount

 

COST OF CONSTRUCTION

(Construction of Structure, Finishing,

Additional & External Works ) 30,75,000

 

SITE INFRASTRUCTURE

(Structural Design, Site Mobilization,

Materials, Store & temp. Accommodation, etc.) 12% 3,69,000

 

FOUNDATION & PLINTH BEAM

(Excavation, Footing Concreting, Rebar &

Column, Soil filling, compaction, PCC for Plinth,

Concreting, shuttering & rebar) 10% 3,07,000

 

GROUND FLOOR

(Ground floor PCC, Column, Lintel, Sunshade,

Block Work until Roof level, Beam & slab shuttering,

rebar & concreting & De-shuttering) 12% 3,69,000

 

FIRST FLOOR

(Column, Lintel, Sunshade, Block Work until Roof

level, Beam & slab shuttering, rebar & concreting

& De-shuttering) 12% 3,69,000

 

SECOND/ TERRACE FLOOR

(Terrace water proofing, Weathering Course, &

concerting ) 10% 3,07,000

 

DOORS, WINDOWS & GRILL

(Door, windows frame & window grill) 10% 3,07,000

 

INTERNAL & EXTERNAL PLASTERING

(Ceiling, Wall plastering, for all four elevation,

balcony's, Compound wall & head room) 8% 2,46,000

 

FLOORING & PAINTING

(Flooring, Dadoing, Counter tops, Ceiling &

internal wall painting, (Staircase, Parking & External

wall painting) 14% 4,30,000

 

ELECTRICAL & PLUMBING FIXTURES

(Services 1st fix & final fixtures) 10% 3,07,000

 

HANDIG OVER

(with total completion) 2% 61,500







141 views0 comments

Comments


Multi Storey Building
Subscribe to us

Convallis enimin lobortis diam convallis condimentumin est imperdiet nulla vitaeet mattis atmauris.

Thanks for subscribing!

bottom of page